Testimonial Form
Please fill in the form below to submit your testimonial.
Required fields are marked *
Please fill in the form below to submit your testimonial.
Required fields are marked *
Location : Barangay Aplaya, Caingin at Labas
Units : 1,068 Units
Status : Started Land Development – March 2008; On-going site development
Another affordable, executive-like residential subdivision with approximately 410 residential lots designed for Duplex and Quadruplex units, Sta. Rosa Garden Villas III is a community which covers a net area of approximately 6.8 hectares of prime real estate and with an expansion of 8.5 hectares on phase II or a total of 15.3 hectares of site development. Sta. Rosa Garden Villas III is nearing completion before the end of 2006.
With just 250 meters away from J.P. Rizal Avenue, and less than 500 meters away from the city center, homeowners will enjoy the advantages of living close to everything: schools, churches, hospitals, shopping malls, most recent is the new 60-hectares Shoe Mart along the Old National Highway. Only few meters away from the new and upcoming commercial Waterfront located along Laguna de Bay, where fast ferries from Sta. Rosa City to Manila shall be docked.
House Features
• Rough cement floor finish
• Tiled toilet and bath
• Solid concrete walls and floor finish
• Semi concrete stair construction with steel railing
• Tool joint cement finish on interior wall
• Sandblasted and painted house exteriors.
• Primaflex board on exterior ceiling
• Prepainted roofing sheets
• Steel frame roofing system
• Firewall breaker
• Steel door jamb frame
• Steel windows
• High grade water and sewer lines
• Tank type water closet
• Individual septic tank
• Steel section fascia board
• Tiled kitchen counter
• Provision for 2 bedrooms on 2nd floor
Site Features
• Entrance Gate and Garden
• Clubhouse
• Centralized Water System
• Parks and Playgrounds
• Underground Drainage System
• MERALCO Power Lines
• Basketball Court
Location : Barangay Aplaya, Caingin at Labas
Units : 1,068 Units
Status : Started Land Development – March 2008; On-going site development
Another affordable, executive-like residential subdivision with approximately 755 residential lots designed for Duplex and Quadruplex units, Sta. Rosa Garden Villas III Phase 2 is a community which covers a net area of approximately 7.8 hectares of prime real estate nearing completion in year 2008.
With just 250 meters away from J.P. Rizal Avenue, and less than 500 meters away from the city center, homeowners will enjoy the advantages of living close to everything: schools, churches, hospitals, shopping malls, most recent is the new
60-hectares Shoe Mart along the Old National Highway.
House Features
• Rough cement floor finish
• Tiled toilet and bath
• Solid concrete walls and floor finish
• Semi concrete stair construction with steel railing
• Tool joint cement finish on interior wall
• Sandblasted and painted house exteriors.
• Primaflex board on exterior ceiling
• Prepainted roofing sheets
• Steel frame roofing system
• Firewall breaker
• Steel door jamb frame
• Steel windows
• High grade water and sewer lines
• Tank type water closet
• Individual septic tank
• Steel section fascia board
• Tiled kitchen counter
• Provision for 2 bedrooms on 2nd floor
• Provision for 3rd floor
Site Features
• Entrance Gate and Garden
• Multi Purpose Clubhouse
• Centralized Water System
• Parks and Playgrounds
• Underground Drainage System
• MERALCO Power Lines
Location : Barangay Aplaya, Caingin at Labas
Units : 1,068 Units
Status : Started Land Development – March 2008; On-going site development

Sta. Rosa Garden Villas II is situated in Barangay Macabling, very accessible thru the old National Highway. A duplication of Garden Villas I although it is not as big, is a well secured community, which is composed of well respected home owners from all walks of life.
Sta. Rosa Garden Villas II is a stone throw away from the 60 hectares SM City Sta. Rosa and conveniently located near everything you can think of. It’s few minutes away from business centers and shopping malls, reputable schools and of course the Enchanted Kingdom.
House Features
• Rough cement floor finish
• Tiled toilet and bath
• Solid concrete walls and floor finish
• Semi concrete stair construction with steel railing
• Tool joint cement finish on interior wall
• Sandblasted and painted house exteriors.
• Primaflex board on exterior ceiling
• Prepainted roofing sheets
• Steel frame roofing system
• Firewall breaker
• Steel door jamb frame
• Steel windows
• High grade water and sewer lines
• Tank type water closet
• Individual septic tank
• Steel section fascia board
• Tiled kitchen counter
• Provision for 2 bedrooms on 2nd floor
Site Features
• Entrance Gate and Garden
• Clubhouse
• Mini Golf Course
• Centralized Water System
• Underground Drainage System
• MERALCO Power Lines
• Basketball Court with floodlights
Location : Barangay Aplaya, Caingin at Labas
Units : 1,068 Units
Status : Started Land Development – March 2008; On-going site development

Designed to suit your most discriminating taste, Sta. Rosa Garden Villas is located in Barangay Labas, and very near the first class communities of exclusive subdivisions. Its location is 800 meters away from Sta. Rosa Commercial Complex and City Hall. It is very accessible to all kinds of public transportation.
Conveniently located near everything you can possibly think of. Its few minutes away from business centers and shopping malls such as Walter Mart, Target Mall, and the recently built SM City Sta. Rosa not to mention the popular theme park, Enchanted Kingdom. Some reputable Schools within the vicinity are Dominican College, Brent School, St. Scholastica, Don Bosco and Perpetual College within the city. Also nearby is the community hospital and Binan Doctor’s Hospital.
House Features
• Rough cement floor finish
• Tiled toilet and bath
• Solid concrete walls and floor finish
• Semi concrete stair construction with steel railing
• Tool joint cement finish on interior wall
• Sandblasted and painted house exteriors.
• Primaflex board on exterior ceiling
• Prepainted roofing sheets
• Steel frame roofing system
• Firewall breaker
• Steel door jamb frame
• Steel windows
• High grade water and sewer lines
• Tank type water closet
• Individual septic tank
• Steel section fascia board
• Tiled kitchen counter
• Provision for 2 bedrooms on 2nd floor
Site Features
• An Elegant Entrance Gate and Garden
• First Class Swimming Pool / Kiddie Pool
• Beautiful 2-storey Clubhouse
• Parks and Playgrounds
• Centralized Water System
• Underground Drainage System
• MERALCO Power Lines
• Basketball Court with floodlights
Typhoon Ondoy and Pepeng gad left the country with so much an accounted damages to lives and properties. With the advent of the typhoon, Home Development Mutual Fund (HDMF) has passed circulars to all Pag-ibig borrowers in areas directly affected by typhoon Ondoy, a moratorium on Amortization payments of Pag-ibig borrowers.
Covered by the moratorium are Pag-ibig Short Term Loan and Housing Loan from the following areas: The whole of NCR, Region I – Pangasinan, La Union, Ilocos Sur; region II – Isabel, Quirino, Nueva Vizcaya; Region III – Aurora, Nueva Ecija, Zambales, Pampanga, Bulacan,Tarlac, Bataan; Region IV-A- Cavite, Laguna, Batangas, Rizal, Quezon; Region IV-B – Occidental Mindoro, Oriental Mindoro, Marinduque; Region V – Catanduanes, Camarines Norte, Camarines Sur; Cordillera Autonomous Region (CAR) – Mr. Province, Ifugao, Benguet;
To qualify for the moratorium, the borrower must meet the following eligibility requirements;
1. He must be updated with his STL/HL amortization payments as of date of approval of application in case applying for moratorium for such payment.
2. Applications for availment of the loan moratorium maybe filed with the Pag-ibig Fund Branches where the loan is maintained within (30) days from the issuance of these guidelines.
3. Approved applications for moratorium shall be effective retroactively starting on Septeember 26, 2009.
4. A borrower shall have the following options relative to his insurance premiums:
Pay the insurance premiums for the three-month moratorium period at any time during the said period; or pay the insurance at any time within the last year of the loan term.
5. The borrower’s loan term shall be extended for another three (3) months but the STL/HL
Amotization, interest rate, and other conditions of the loan shall remain the same.
6. STL/HL payments shall be suspended for the period specified above at no additional cost to the borrower. Thus, no penalty and interest shall be charged during the moratorium period.
For more information please visit the HDMF Corporate Headquarters, The Atrium of Makati, Makati Avenue, Makati City of Call Pag-ibig Call Center 724-4244